ACT (RS) ABB Loco (English) (27. PROGRAME SWITCHES )

January 10, 2021, 12:19 PM
Share

PROGRAME SWITCHES 
152 Rotary switch Failure mode operations
Position
0- Normal Position – Fine control throughout the range
1- Failure mode – Fine control in steps through aux.contacts
 When throttle is not responding then Driver can keep this switch from 0 to 1 and now same throttle will respond, called failure mode operation.
154 -Rotary switch Bogie cut-out
Position 
 
NORM : Traction converter-1 & 2 ( All TM’s) in service
I: Traction converter-1 (TM 1-2-3 WAG-9/WAP-7) (TM1-2 WAP-5) isolated
II: Traction converter-2 (TM 4-5-6 WAG-9/WAP-7) (TM 3-4 WAP- 5) isolated
I+II: Traction converter-1&2(TM1-2-3&4-5-6 WAG-9/WAP-7) (TM1-2 & 3-4 WAP-5) isolated
160 – Rotary switch Configuration 
Position 
1 : Normal        Normal mode
0 : Shunting (Max Speed 15 KMPH) mode
237.1- Rotary switch Vigilance device cut-off
 Position 
1 : Normal VCD is in service
0 : Isolation VCD is isolated
   
Disclaimer: The Information /News /Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.
Share

This entry was posted in 2 Railway Employee, 7 Study Material & Guide, ABB Loco, AC Traction - Locomotive, Railway Employee