Terminology used in a Caution Order with their Meanings

06-03-2022

Terminology used in a Caution Order with their Meanings 1. O.E.S. - OBEY ENGINEERING SIGNAL 2. C.T.R. - COMPLETE TRACK RENEWAL 3. T.R.R. -  THROUGH RAIL RENEWAL 4. L.W.R. - LONG WELDED RAIL 5. C.W.R. - CONTINUOUS WELDED RAIL 6. T.S.R. - THROUGH SLIEEPER RENEWAL 7. S.W.R. - SHORT WELDED RAIL 8. U/S -  UNSERVISABLE SLEEPER 9. S.E.J. - SWITCH EXPANSION JOINT 10 U.C. -  UNCONSOLIDATED (LESS BALLAST) 11. S.D.I.R. -  STOP DEAD IF REQUIRED 12. P.B.R. - PULLING BACK OF RAILS 13. R.A.T. - RAILWAY AFFECTED TANK 14 T.F.R. - THROUGH FITTINGS RENEWAL 15. T.B.T.R. -  THROUGH BRIDGE TIMBER RENEWAL 16. T.R.R. - THROUGH WELD RENEWAL 17.

Read More
RBE 42/2018 – APPOINTMENT ON COMPASSIONATE GROUNDS
March 26, 2018

Read More
Important Decisions Taken By Railway Board Regarding Health
March 26, 2018

Read More
CHANGE IN NPS (NATIONAL PENSION SCHEME)
March 26, 2018

    INFORMATION CENTER -

Read More
RBE 40/2018, Clarification regarding issuance of passes on longer route to destination ,if this longer happens to be quicker than the direct route.
March 26, 2018

Read More
NON IMPLEMENTATION OF NORMS FOR NON GAZETTED OF SIGNALIING STAFF (GROUP C & D
March 23, 2018

INFORMATION CENTER -

Read More
RBE No. 44/2018 Time – limit for submission of claims for Travelling Allowances – reg.
March 23, 2018

Government of India / Bharat Sarkar  Ministry of Railways / Rail Mantralaya  (Railway Board) RBE No. 44/2018 No. F(E)I/2018/AL-28/29 New Delhi, Dated: 23.03.2018. General Manager (P), All Indian Railways, PUs etc. (As per Standard Mailing List) Sub: Time-limit for submission of claims for Travelling Allowances –

Read More

Latest News

Integral Coach Factory, Perambur