ACT (RS) ABB Loco (English) (26. PASSING NEUTRAL SECTION)

10-01-2021

PASSING NEUTRAL SECTION ( SU )  Before approaching neutral section: 1-Ensure that MR pressure is between 8.5 to 10 kg/cm2 2-Bring TE / BE throttle to ‘0” gradually before 250M board. 3-At DJ open board, open DJ by BLDJ, LSDJ will glow, Aux. sound will stop, but U meter will show OHE supply. 4-At actual neutral section location, OHE meter will comes down to “0” and will shoot up when neutral section over. 5-In PTFE type neutral section, at higher speed, needle will just fluctuate. 6. At DJ close board close VCB (DJ), and resume normal traction. In case MU operation a)The command from the master locomotive to switch the main circuit breaker “ON”,

Read More
How are Railway Wheel Sets made…The complete Assembly Process with Brake Disks
February 1, 2021

Railway Wheel-Set Assembly Process, Disking of Wheels and Brake Disk with Final Machining on 500 Ton Press for LHB FIAT

Read More
Fixing of Yaw & Vertical Dampers on the FIAT LHB bogie of Passenger Coaches
February 1, 2021

Read More
Secondary Suspension Assembling process, FIAT LHB bogie of Indian Railways Passenger Coaches.
February 1, 2021

Read More
Traction Frame Assembly of FIAT Passenger Bogie of Indian Railways.
February 1, 2021

Read More
ट्रेनों में लगेंगी स्मार्ट खिड़कियां, प्राइवेसी के साथ ही सेहत का भी रखेंगी ख्याल
January 28, 2021

भारतीय रेलवे (Indian Railways) ने यात्रियों के सफर को बेहतर करने के लिए आए दिन ट्रेनों में कई तरह की सुविधाएं देता रहा है. एक नए प्रयोग के चलते

Read More
TNC (TRAIN NOTING CLERK ) GUIDE – INDIAN RAILWAY
January 24, 2021

भारतीय रेल का इतिहास एवं प्रगति भारतीय रेल का संगठनात्मक ढांचा परिचालन विभाग का सेटअप महत्वपूर्ण परिभाषाए G & SR -

Read More

General - Public

Raipid Rail क्या है? कैसे बदलेगा शहरों का भविष्य | Delhi-Meerut RRTS पूरी जानकारी

view all>>

Latest News

Telephone Directory – Indian Railway Officer –  West Central Railway 

1 Rail News

Raipid Rail क्या है? कैसे बदलेगा शहरों का भविष्य | Delhi-Meerut RRTS पूरी जानकारी

view all>>