Breaking News
Bhopal: Katni in Madhya Pradesh will have India's longest railway bridge, 14 km on the up line, almost three and half times longer than Vembanad rail bridge in Kerala that connects Edappally and Vallarpadam in Kochi and is 4.62 km long. Called Katni grade separator, down line of the bridge would be of 7 km. Its total length would be 21 km up and down side. Project received clearance from Cabinet Committee on Economic Affairs (CCEA) recently along with other railway projects. Design and survey of the bridge has been completed and it will take 5 years for completion. Talking to TOI, chief public relations officer (CPRO) of West Central Railway Surendra Yadav said, "Katni
Read Moreसर्दी का मौसम आने के साथ ही ट्रेनों के लेट होने का सिलसिला भी शुरू हो गया है. भारत में ट्रेन लेट होना काफी आम भी है. लेकिन क्या आप जानते
Read MoreIndia’s first semi high speed train Vande Bharat express train successfully completed its inaugural run from Delhi to Varanasi on 15th Feb 2018. It is scheduled to start its commercial run from 17th Feb from Delhi. During the transportation back from Varanasi it was stopped at Chamraula station of National Capital Region, about 18 kms after
Read MoreIn August 2014 the first coach was rolled out and since then it has doubled production almost every year. It is expected to produce 1,422 coaches in 2018-19 of which 1,220 coaches have already been produced till date. MCF has least cost among all Production Units of Indian Railways for coaches produced. New concepts such as extensive use of
Read MoreRead More
New Railway Services – Pension Rules, 2026
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Syllabus – स्टेशन मास्टर (STATION MASTER) विभागीय चयन परीक्षा का समेकित पाठ्यक्रम (CONSOLIDATED)
डोर स्टेप बैंकिंग (Door Step Banking)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
RBE No. 62/2025 Regarding Promotion/Seniority/Transfer – Commercial Dept (CC, TC, ECRC Merged)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
भारतीय रेल विशेष अभियान 6: 5,884 स्टेशनों पर रेल जन संवाद
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
दुनिया के सबसे बड़े रेल नेटवर्क (2025)
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
New Railway Services – Pension Rules, 2026
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
Integral Coach Factory, Perambur
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
SHINE Module Indian Railways: महिला रेलकर्मी अब ऑनलाइन दर्ज कर सकेंगी यौन उत्पीड़न की शिकायत
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
ट्रेन में चोरी हो जाए तो क्या करें? FIR और शिकायत प्रक्रिया पूरी जानकारी
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
SHINE Module Indian Railways: महिला रेलकर्मी अब ऑनलाइन दर्ज कर सकेंगी यौन उत्पीड़न की शिकायत
भारतीय रेल विशेष अभियान 6: 5,884 स्टेशनों पर रेल जन संवाद
भारतीय रेल विशेष अभियान 6: 5,884 स्टेशनों पर रेल जन संवाद
Syllabus – स्टेशन मास्टर (STATION MASTER) विभागीय चयन परीक्षा का समेकित पाठ्यक्रम (CONSOLIDATED)
All India TLC (Indian Railway) Phone Numbers
Are you sure you want to delete this element?
Close