Terminology used in a Caution Order with their Meanings

March 6, 2022, 2:45 PM
Share

Terminology used in a Caution Order with their Meanings

1. O.E.S. – OBEY ENGINEERING SIGNAL

2. C.T.R. – COMPLETE TRACK RENEWAL

3. T.R.R. –  THROUGH RAIL RENEWAL

4. L.W.R. – LONG WELDED RAIL

5. C.W.R. – CONTINUOUS WELDED RAIL

6. T.S.R. – THROUGH SLIEEPER RENEWAL

7. S.W.R. – SHORT WELDED RAIL

8. U/S –  UNSERVISABLE SLEEPER

9. S.E.J. – SWITCH EXPANSION JOINT

10 U.C. –  UNCONSOLIDATED (LESS BALLAST)

11. S.D.I.R. –  STOP DEAD IF REQUIRED

12. P.B.R. – PULLING BACK OF RAILS

13. R.A.T. – RAILWAY AFFECTED TANK

14 T.F.R. – THROUGH FITTINGS RENEWAL

15. T.B.T.R. –  THROUGH BRIDGE TIMBER RENEWAL

16. T.R.R. – THROUGH WELD RENEWAL

17. T.T.R. – TROUGH TURNOUT RENEWAL

18. T.B.R. – THROUGH BALLAST RENEWAL

19. B.C.M. –  BALLAST CLEANING MACHINE 20. D/S DEEP SCREENING

21. PQRS – PLASSER QUICK RELAYING SYSTEM

22. T.R.T. – TRAIL RELAYING TRAIN

23. R.O.B. – RAIL OVER BRIDGE

24. I.M.R. – IMMEDIATE REMOVAL RAIL (WITHIN 2 Or 3 DAY WHEEL BURNT RAILS)

   
Disclaimer: The Information /News /Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.
Share

This entry was posted in 2 Railway Employee, Abbreviations, Engineering (P Way), Know About, Loco Pilot General Info, Operating Guide, Railway Employee Tags: