Railway Board order Regarding Inter-Railway Request Transfer dated 1.10.2020 RBE 85/2020

02-11-2020

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAILWAY BOARD RBE 85/2020 No.E(NG)I/2020/TR/16                                         New Delhi, dated October 1, 2020 The General Managers (P), All Zonal Railways and Production Units. Sub : Inter-Railway Request Transfer – Hardships being faced by the staff – Reg. As the Railways are aware, transfers on request of officials working on the Zonal Railways cannot be claimed as a matter of right. However, enabling provisions under Ministry of Railways’ decision below Rule 226 of IREC Vol.I allows Transfer of Railway Servant in Group ‘C’ on request on the grounds of hardship from one Railway to another.

Read More
WDG-3A – रिपेयर बुक(Repair Book)
January 4, 2021

Read More
WDG-3A – ट्विन बीम हेडलाईट ( Twin Beam Head Light)
January 4, 2021

Twin Beam Head Light  On WDG3A loco two head lights are provided on each side of Loco viz. short hood and long hood. HLB (head light circuit breaker) is provided on front panel. Head light rotating switch is provided on both control stand having 6 positions. To glow head light following switches should be in on position 1. Battery knife

Read More
WDG-3A – लोको स्टेबल करना ( Procedure for Stabling Loco )
January 4, 2021

 Procedure for Stabling Loco  1. Loco to be stop after clearing fouling mark. 2. Apply loco brake by SA-9. 3. Apply hand brake. 4. Apply wooden wedges/Iron skids. 5. Shut down the engine properly and put off all circuit breakers and switches. 6. Remove A9, SA9 handle in application position and RH in neutral position. 7. Entries to

Read More
WDG-3A – लोको चलाने का तरीका (How to Move the Loco)
January 4, 2021

How to Move the Loco First of all check the locomotive after ensuring every thing is normal then starts the engine systematically. All pressure to be adjusted and ensure loco brake in applied condition, then release hand brake, remove wooden wedges. Move the Loco with following procedure – 1. Put ECS on RUN. 2. Put RH in desired

Read More
WDG-3A – गेजेस (Gauges )
January 4, 2021

Gauges  Following gauges are provided in loco  1. Brake Cylinder Pressure Gauge It is provided on both control stands. Brake cylinder pressure gauge shows 3.0 kg/cm² pressure on loco brake application. 2. Brake Pipe Pressure Gauge It is located on both control stands. BP pressure gauge shows 5.0 kg/cm² on A9 release condition. 3. MR

Read More
WDG-3A व्हील स्किडिंग के बचाव हेतु क्या करे और क्या न करे (To Avoid Wheel Skidding Do’s /Don’t)
January 4, 2021

Read More

General - Public

Raipid Rail क्या है? कैसे बदलेगा शहरों का भविष्य | Delhi-Meerut RRTS पूरी जानकारी

view all>>

Latest News

Telephone Directory – Indian Railway Officer –  West Central Railway 

1 Rail News

Raipid Rail क्या है? कैसे बदलेगा शहरों का भविष्य | Delhi-Meerut RRTS पूरी जानकारी

view all>>