Breaking News
TRAIN HANDLING IN HUMP (KNOLL) & CRESTING GRADIENT┬а Starting of train on a hump or cresting grade There are no special requirements for starting on a hump or cresting grade. The starting procedure are the same as for starting the train on an ascending (up) grade. Zonal Railway Training Institute, Central Railway, Bhusawal ┬йAC Loco
Read MoreCOMPARISON BETWEEN DRIVING A ROAD VEHICLE AND TRAIN┬а ┬а Just as we expect from a road vehicle driver that he should drive his vehicle smoothly and safely, so is the expectation of public at large from the train driver. The similarity however, ends here, as there is a marked difference in the Zonal Railway Training Institute, Central Railway,
Read MoreBrake management┬а ┬а 1. Reduce notches one by one┬а ┬а 2. Ensure NR is on тАШ0тАЩ┬а ┬а 3. Run your train in coasting at least for 100 meter.┬а ┬а 4. Reduce BP pressure through A-9 up to minimum reduction (0.5 kg/cm2) only┬а ┬а 5. Wait for 8-10 seconds (In this time BP of whole train will be dropped.) 6. Reduce more BP pressure as
Read More┬аLUBE OIL SYSTEM┬а Purpose┬а-To lubricate and cool the diesel engine equipment with filtered, cooled and pressurized lube oil. Description┬атАУ Forced lubrication system is used in diesel locomotive, detail of system is as - Lower portion of engine crank case, it termed as lube oil sump, its capacity is 1210 litters. To fill the lube
Read MoreHEAT ENGINE┬а ┬а Heat engine┬а- Heat engine is the machine which converts heat energy into mechanical energy. Heat engine are of two types. a. External combustion engine┬а- In External combustion engine fuel is burnt or ignited outside the engine cylinder. So it is called as external combustion engine e.g. Steam engine. b. Internal
Read More┬аHorn Failure┬а 1. If horn is failed at originating station than the loco to be declare failed and other loco is to be arranged. 2. If horn is failed in enroute than inform to station master at first opportunity. The station master will arrange other loco with consult of PCOR. If loco is not available and permitted to work with same loco
Read MoreрдбреЛрд░ рд╕реНрдЯреЗрдк рдмреИрдВрдХрд┐рдВрдЧ (Door Step Banking)
рдбреЛрд░ рд╕реНрдЯреЗрдк рдмреИрдВрдХрд┐рдВрдЧ (Door Step Banking)
Transfer on Spouse Ground at Same Station
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Clarifications regarding Fixation of pay and grant of increments in the revised pay structure
KNOW ABOUT тАУ SPL KINDS OF LEAVE – RAILWAY
Consolidated Orders of┬а ┬аMACP Scheme by By Personnel Branch BZA Division
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
Clarification – тАЬRegular EmployeesтАЭ for appearing GDCEтАФMinimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in┬а Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
Railway Management Guide – рдкреНрд░рдмрдиреНрдзрди
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
Integral Coach Factory, Perambur
Post Retirement Complementary Passes For Railway Employees тАУ Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule┬а of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
рд░реЗрд▓рд╡реЗ рдореЗрдВ рдкрддрд┐-рдкрддреНрдиреА рдПрдХ рдЬрдЧрд╣ рд╣реЛрдВрдЧреЗ рддреИрдирд╛рдд
рдбреЛрд░ рд╕реНрдЯреЗрдк рдмреИрдВрдХрд┐рдВрдЧ (Door Step Banking)
рдбреЛрд░ рд╕реНрдЯреЗрдк рдмреИрдВрдХрд┐рдВрдЧ (Door Step Banking)
Are you sure you want to delete this element?
Close