Breaking News
Complete Track Renewal (CTR) refers to the most thorough track replacement regime where rails, sleepers, etc., are fully replaced. Through Rail Renewal (TRR) refers to the replacement of rails in a given section of track, while Through Sleeper Renewal (TSR) refers to the replacement of sleepers. Similarly, there are Through Turnout renewal (TTR), Through Fitting Renewal (TFR), Through Weld Renewal (TWR), and Through Bridge Timber Renewal (TBTR). Each of these has a more thorough ('primary') and less thorough ('secondary') versions, hence you see the acronyms like 'CTR(P)' for 'Complete Track Renewal - Primary', or 'TSR(S)' for 'Through Sleeper Renewal - Secondary. Additionally there are
Read MoreSome WAP / WAM models have in-cab AWS / ATS (auxiliary warning system, automatic train stop). AWS provides prior in-cab notification of distant or home signals that are displaying danger or 'on'. ATS provides for a locomotive to be brought to a halt in case it overshoots an 'on' signal that it should not have. This has been tried out on the
Read MoreIR does not appear to have begun using any hotspot detectors or trailing equipment detectors or other methods for automatic detection of mechanical problems in rolling stock, apart from some isolated experiments. Axle counters or track circuits are the primary means of ensuring that a section of track is clear - problems from broken or detached
Read MoreApart from axle counters or track circuits that indicate that a train has passed out of a section of track, in some places magnetic detectors are used for last vehicle proving. A permanent magnet suspended a few inches above the track from the last vehicle of a train passes right over a sensor which is positioned in the center of the track. The
Read MoreAxle counters are widely used by IR to ensure that all wagons or coaches of a train have indeed passed a given point тАФ out of a block section, out of the station limits, out of yard limits, other point zones, etc. ('last vehicle proving', 'block proving', or 'block verification', serving the same purpose as the visual 'Last Vehicle Check' or LVC
Read MoreThe most common form of track circuit used is the detection of a train by the closing of an electrical circuit between the two rails because of the conducting nature of the rolling stock. This circuit may use DC in the simplest form, or may use AC, at various frequencies or with coded pulses. DC Track Circuit (double-rail) Double-rail DC track
Read MoreA┬аLocking Table┬аis a table that gives the complete set of interlocking relationships among signal and point levers in a cabin. A┬аPull Sheeet┬аis similar, in that it conveys the same information, but is geared towards the lever operator's convenience in showing which other levers need to be pulled for any lever. A sample locking table is shown
Read MoreRBE No. 62/2025 Regarding Promotion/Seniority/Transfer тАУ Commercial Dept (CC, TC, ECRC Merged)
RRB Railway Exams List 2025: Types of Railway Exams, Posts, Eligibility & Selection Process
рдбреЛрд░ рд╕реНрдЯреЗрдк рдмреИрдВрдХрд┐рдВрдЧ (Door Step Banking)
RBE No. 62/2025 Regarding Promotion/Seniority/Transfer тАУ Commercial Dept (CC, TC, ECRC Merged)
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Clarifications regarding Fixation of pay and grant of increments in the revised pay structure
рджреБрдирд┐рдпрд╛ рдХреЗ рд╕рдмрд╕реЗ рдмрдбрд╝реЗ рд░реЗрд▓ рдиреЗрдЯрд╡рд░реНрдХ (2025)
KNOW ABOUT тАУ SPL KINDS OF LEAVE – RAILWAY
Consolidated Orders of┬а ┬аMACP Scheme by By Personnel Branch BZA Division
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
Clarification – тАЬRegular EmployeesтАЭ for appearing GDCEтАФMinimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in┬а Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
Railway Management Guide – рдкреНрд░рдмрдиреНрдзрди
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
Integral Coach Factory, Perambur
Post Retirement Complementary Passes For Railway Employees тАУ Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule┬а of Train Manager (Guard)
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
рд░реЗрд▓рд╡реЗ рдореЗрдВ рдкрддрд┐-рдкрддреНрдиреА рдПрдХ рдЬрдЧрд╣ рд╣реЛрдВрдЧреЗ рддреИрдирд╛рдд
рджреБрдирд┐рдпрд╛ рдХреЗ рд╕рдмрд╕реЗ рдмрдбрд╝реЗ рд░реЗрд▓ рдиреЗрдЯрд╡рд░реНрдХ (2025)
Are you sure you want to delete this element?
Close