Process Reform- Regarding Station/Headquarter leave permission for going abroad on leave

06-01-2021

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAILWAY BOARD No. 2017 /Trans/Process Reforms/Estt.                                                  New Delhi, Dated: 29.11.2017 The General Manager, All Indian Railways/PUs, NF(C), CORE The DG/RDSO/Lucknow, DG/NAIR CAOs, DMW/ Patiala, WPO/ Patna, COFMOW/NDLS, RWP/Bela, IROAF Sub: Process Reform- Regarding Station/Headquarter leave permission for going abroad on leave During interactions with field officials it has emerged that time bound grant of permission to employees for leaving station/headquarters for going abroad while on leave is an issue. The matter has been considered and following instructions

Read More
ACT (RS) ABB Loco (English) (38. RESETTING OF MCB)
January 10, 2021

Resetting of MCB Sometimes MCB trips momentarily without any equipment failure. Drivers should try to reset MCB once. While  resetting ABB make MCB, resetting screw below the respective circuit breaker turns to horizontal position from initial vertical position. This screw should be turned to vertical position first and then, MCB should  be

Read More
ACT (RS) ABB Loco (English) ((37. ACTIVE FUNCTIONS WITH DEACTIVATED DRIVER’S CAB)
January 10, 2021

Active functions with deactivated driver’s cab  While the cab deactivated , the following functions remain operative. 1. MEMOTEL functions 2. Catenary voltage display 3. Emergency brake cock on assistant driver’s side 4. Cab and desk lighting 5. Windshield wipers 6. Fault display screen 7. Marker lights switches 8. Cab venting

Read More
ACT (RS) ABB Loco (English) (36. CONTROL ELECTRONICS)
January 10, 2021

Control Electronics All functions of the locomotive are controlled by the control electronics. It takes the form of bus stations with processors. The bus stations communicate with each other via fiber optic Cables which are resistant to the effects of Electro Magnetic Interference The diagnostic equipment comprises a diagnosis computer with

Read More
ACT (RS) ABB Loco (English) (35. SANDING)
January 10, 2021

Sanding Sanding is done automatically on leading wheels when 1. Pressing ‘foot switch’ of sander. 2. Anti spin device activated. Note :-Don’t press PSA continuously, but press and release it. Continuous sanding is not possible, If PSA pressed continuous for 1 minute, then dead mans penalty brakes will apply. 10-12 sec pause is

Read More
ACT (RS) ABB Loco (English) (34. MEMOTEL)
January 10, 2021

Memotel (Speedometer) For indicating the speed of the loco, memotel type speedometer is provided in both the cab. Speed is indicated by both needle as well as LCD screen of SPM.  For Data entry one push button “A” is provided on SPM When push button ‘A’ is pressed repeatedly following function done.(8 digits) in sequence. 1.

Read More
ACT (RS) ABB Loco (English) (33. MAIN RESERVOIR)
January 10, 2021

Main Reservoir  For shortage of compressed air pressure MR are provided on this loco. In WAP-7 & WAG-9 loco, Two MR and one AR is provided in machine Room in vertical manner. Capacity of MR is 450 liters. Drain coc is provided below each MR, which can be operated from machine room. In WAP-5 MR are located in under truck and each MR

Read More

General - Public

Raipid Rail क्या है? कैसे बदलेगा शहरों का भविष्य | Delhi-Meerut RRTS पूरी जानकारी

view all>>

Latest News

Telephone Directory – Indian Railway Officer –  West Central Railway 

1 Rail News

Raipid Rail क्या है? कैसे बदलेगा शहरों का भविष्य | Delhi-Meerut RRTS पूरी जानकारी

view all>>