AC Simulator – TRAIN HANDLING ON A LEVEL SECTION (लेवल सेक्शन में गाड़ी का संचालन )

06-01-2021

TRAIN HANDLING PROCEDURES IN DIFFERENT GRADIENTS    (Starting, Negotiating & Stopping of train)    TRAIN HANDLING ON A LEVEL SECTION    Starting of train from level section    i) Keep train brakes in released condition.  ii) Move MP to take 1 notch and simultaneously release SA-9.  iii) Wait for few seconds until the Ammeter reading stops increasing and begin to reduce.  iv) Advance MP to notch 2 and again note Ammeter indication as in (iii). v) If necessary, advance the MP to 3 or 4 notches but always wait for a few second {as in (iii)} between each notch position.  vi) When the train is in a stretched condition and in motion, slowly advance the MP as

Read More
ACT (RS) ABB Loco (English) (34. MEMOTEL)
January 10, 2021

Memotel (Speedometer) For indicating the speed of the loco, memotel type speedometer is provided in both the cab. Speed is indicated by both needle as well as LCD screen of SPM.  For Data entry one push button “A” is provided on SPM When push button ‘A’ is pressed repeatedly following function done.(8 digits) in sequence. 1.

Read More
ACT (RS) ABB Loco (English) (33. MAIN RESERVOIR)
January 10, 2021

Main Reservoir  For shortage of compressed air pressure MR are provided on this loco. In WAP-7 & WAG-9 loco, Two MR and one AR is provided in machine Room in vertical manner. Capacity of MR is 450 liters. Drain coc is provided below each MR, which can be operated from machine room. In WAP-5 MR are located in under truck and each MR

Read More
ACT (RS) ABB Loco (English) (32. MECHANICAL FEATURE OF 3 PHASE LOCO)
January 10, 2021

Miscellaneous  Mechanical features of 3-phase AC loco. The three axles, three motor Co-Co bogie assemblies, is one of the major parts of the Locomotive. Two bogie assemblies support the entire weight of the 3-phase locomotive and provide a means for transmission of the tractive effort to the rails. The bogies are designed to withstand the

Read More
ACT (RS) ABB Loco (English) (31. EMERGENCY BRAKE APPLICATION)
January 10, 2021

An Emergency Braking Operation  Emergency brakes will apply through brake electronics when: 1.Response from the Vigilance module 2.Permitted maximum speed being exceeded 3.Moving of the driver’s brake handle to position EMERGENCY 4.Actuation of the emergency brake cock on the assistant driver’s side 5.Actuation of the emergency

Read More
Index – Store Department Guide – Indian Railway (English)
January 10, 2021

 INVENTORY MANAGEMENT Scrap Disposal  RETURNED STORES ISSUE AND DISTRIBUTION OF STORES Receipt  And Inspection of stores  TENDER EVALUATION AND MISCELLANEOUS POLICY ISSUES IN  PURCHASES Purchase Procedure on zonal Railways  PURCHASE POLICY PLANNING OF STOCK ITEMS & SYSTEMS OF RECOUPMENT PLANNING OF

Read More
ACT (RS) ABB Loco (English) (30. REGENARETIVE BRAKING)
January 10, 2021

Releasing Parking Brake 1.Press BPPB illuminated red button once red lamp will get extinguished and 6 kg/cm2 pressure enter in parking activators which can seen in PB gauge indicating that PB are released OR 2.Press “Release” push button on parking brake solenoid 30, BPPB red lamp will extinguished, air will be admitted in parking

Read More

General - Public

Raipid Rail क्या है? कैसे बदलेगा शहरों का भविष्य | Delhi-Meerut RRTS पूरी जानकारी

view all>>

Latest News

Telephone Directory – Indian Railway Officer –  West Central Railway 

1 Rail News

Raipid Rail क्या है? कैसे बदलेगा शहरों का भविष्य | Delhi-Meerut RRTS पूरी जानकारी

view all>>