Breaking News
Result of Train Manager (Goods Guard) Departmental Exam
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Result of Train Manager (Goods Guard) Departmental Exam
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
The proposed Cine Dome will be a full-fledged cinema for showcasing movies including latest movie releases & documentaries and other content etc. along with meals/snacks/beverages for customers/visitors/Guests. However, no permanent structure will be allowed to be constructed. The Cine Dome will be manned by the tenderers own operators. Crowd management shall be the sole responsibility of the party
Setting up, Operation, Maintenance & Management of Pre-Fabricated Cine Dome shall be the sole responsibility of the licensee and the cost for the same is to be borne by the licensee (it includes cost of erecting structures, Pre-Fabricated Cine Dome related items, safety & security, necessary amenities, laying cables, electrical connection, electricity consumption charges, electricity deposit & other incidental expenses etc.). Cost of all the above and incidental expenses incurred for setting up & operation of Pre-Fabricated Cine Dome is to be borne by the licensee
The tenderer will set up Pre-Fabricated Cine Dome as per location’s requirement. For this purpose, he will submit a detailed layout plan/design for necessary approval from competent authority within 30 days of issue of LOA. Railway reserves the right to advise any changes as per its requirement. However, no permanent structure should be built.
Total area around 5000 sq.ft. at each of the above locations.
Reserve price per annum is as under-
1) Dombivli – Rs. 47,85,400/-
2) Juchandra – Rs. 35,82,000/-
3) Igatpuri – Rs. 17,10,400/-
4) Khopoli – Rs. 23,31,100/-
Bidders have to register in IREPS portal of the railways in order to participate in E-Tender closing o¬n 12/10/2023 at 15.00 hrs.
प्रस्तावित सिने डोम ग्राहकों/आगंतुकों/मेहमानों के लिए भोजन/नाश्ता/पेय पदार्थ के साथ-साथ नवीनतम मूवी रिलीज और वृत्तचित्र और अन्य सामग्री आदि सहित फिल्में प्रदर्शित करने के लिए एक सिनेमा होगा। हालांकि, इसके अंतर्गत किसी भी स्थाई ढांचे का निर्माण नहीं होने दिया जाएगा। सिने डोम का संचालन निविदाकर्ता के स्वयं के ऑपरेटरों द्वारा किया जाएगा। भीड़ प्रबंधन की पूर्ण जिम्मेदारी संबंधित पार्टी की होगी |
प्री-फैब्रिकेटेड सिने डोम की स्थापना, संचालन, रखरखाव और प्रबंधन लाइसेंसधारी की एकमात्र जिम्मेदारी होगी और इसकी लागत लाइसेंसधारी द्वारा वहन की जाएगी (इसमें संरचनाओं के निर्माण की लागत, प्री-फैब्रिकेटेड सिने डोम से संबंधित वस्तुएं शामिल हैं) , सुरक्षा और संरक्षा, आवश्यक सुविधाएं, केबल बिछाना, विद्युत कनेक्शन, बिजली उपभोग शुल्क, बिजली बिल और अन्य आकस्मिक खर्च आदि)। प्री-फैब्रिकेटेड सिने डोम की स्थापना और संचालन के लिए उपरोक्त सभी और प्रासंगिक खर्चों की लागत लाइसेंसधारी द्वारा वहन की जाएगी।
निविदाकर्ता स्थान की आवश्यकता के अनुसार प्री-फैब्रिकेटेड सिने डोम स्थापित करेगा। इस प्रयोजन के लिए, वह एलओए (LOA) जारी होने के 30 दिनों के भीतर सक्षम प्राधिकारी से आवश्यक अनुमोदन के लिए एक विस्तृत लेआउट योजना/डिज़ाइन प्रस्तुत करेगा। रेलवे अपनी आवश्यकता के अनुसार किसी भी बदलाव की सलाह देने का अधिकार सुरक्षित रखता है। हालाँकि, कोई स्थायी संरचना नहीं बनाई जानी चाहिए। उपरोक्त प्रत्येक स्थान कुल क्षेत्रफल लगभग 5000 वर्ग फुट |
प्रति वर्ष आरक्षित मूल्य इस प्रकार है-
1) डोंबिवली – रु. 47,85,400/-
2) जूचंद्र – रु. 35,82,000/-
3) इगतपुरी – रु. 17,10,400/-
4) खोपोली – रु. 23,31,100/-
दिनांक 12/10/2023 को 15.00 बजे बंद होने वाले ई-टेंडर में भाग लेने के लिए बोलीदाताओं को रेलवे के आईआरईपीएस पोर्टल पर पंजीकरण करना होगा।
—— —— ——-
दिनांक: 22 सितंबर, 2023
पीआर नंबर 2023/09/36
यह प्रेस विज्ञप्ति जनसंपर्क विभाग, मध्य रेल, मुख्यालय, मुंबई द्वारा जारी की गई है।
This entry was posted in 1 Rail News, General - Public, Rail Development, General, Public Facilities
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close